Home > Buy Now > Other Electrical Equipment > Optical & Electromechanical Technology Trainer
 


Yalong Science & Technology Group Co., Ltd
 
icon Products

line

icon Company Profile
icon Selling Leads

line

 
Contact us
Yalong Science & Technology Group Co., Ltd
[China]
Address:
Yalong Educational Instrument & Equipment Park, Oubei Wenzhou Zhejiang 325101 China
Phone:
86-0577-67315312
Contact name:
Shirley , sale
Inquire now










Yalong Science & Technology Group Co., Ltd



 
Products

Optical & Electromechanical Technology Trainer

Inquire now

Optical & Electromechanical Technology Trainer

Click to enlarge image

 Model Number YL-235

YALONG SCIENCE & TECHNOLOGY GROUP CO., LTD

Order No.:1A013600
    Desc ription
    The trainer is composed of Al alloy frame rail bench, electromechanical parts, PLC mould, frequency converter mould, button mould, power supply mould, wiring terminal bar and various sensors etc., the whole structure is open, can be disassembled. Students can disassemble and adjust the feed and detection parts, transportation parts, distribution parts and automatic production lines etc., freely; PLC mould, frequency converter mould, button mould, common parts can be exchanged and combined randomly, for teaching and training on professional and technical knowledge and skills for electromechanical equipment installation and commissioning, PLC control program writing and running, frequency converter speed regulation system combination and commissioning, PLC control system installation and commissioning, optical and electromechanical equipment combination and commissioning.
    Its PLC mould I/O terminals, frequency converter wiring terminals, all common moulds and PLC terminals are connected with each by safety plugs and sockets, cables; all circuits combined by instruction switches, optical switches, sensors and indication components are connected through the wiring terminal bar, in order to ensure that the students will learn the basic skills and connect circuits quickly, safely and reliably.
    Main functions
    1. Pneumatic technology training:
    The pneumatic actuators such as rotary cylinders, and pneumatic parts such as single-mode control electromagnetic reversing valves, double-control electromagnetic reversing valves and magnetic switches, are available for following pneumatic technology training items:
    pneumatic direction control circuit; pneumatic speed control circuit; sway control circuit; pneumatic sequence control circuit; pneumatic elevator; pneumatic and mechanical arm; pneumatic system installation and commissioning;
    2. Electrical control technology PLC application technology training:
    The PLC mould, frequency converter mould and instruction switches, sensors and so on, available for following PLC application technology training items:
    motor forward and reversed rotation control circuit connection and control program; motor speed regulation control circuit connection and control program; pneumatic direction control program; pneumatic sequential action control program; pneumatic and mechanical arm control program; belt transmission unit control program; pneumatic molding machine control program;  electromechanical equipment control program; automatic production line control program.
    3. Electromechanical equipment installation and technology training
    The electromechanical accessories and parts, PLC mould, frequency converter mould and instruction switches, sensors and so on, are available for following mechanical equipment installation and electromechanical technology training items:
    Transmission unit spindle accuracy commissioning; belt transfer unit installation and commissioning; pneumatic elevator installation and commissioning; distribution unit installation and commissioning; feed unit installation and commissioning; automatic production line installation and commissioning.
    4. Automatic control technology training
    The electromechanical accessories and parts, PLC mould, frequency converter mould and instruction switches, sensors and so on, are available for following electromechanical equipment installation and technology training items:
    proximity switch ; sensors installation and position commissioning; mechanical arm automatic control; belt transmission unit automatic control; Electromechanical equipment automatic control; PLC control system installation and commissioning; automatic production installation and commissioning.
    Main technical parameters
    1. AC power supply: 3-phase AC380V±10%, 50 Hz;
    2. Dimension: 1190×800×1500 mm
    3. Capacity: ≤1.5 KVA
   




Inquire now